Wednesday, March 23, 2016

The Build Begins - March 11, 2016

On March 11th, the first load of lumber was dropped.

hmmmm...where shall we put it?

quite a load





the framers begin - March 12, 2016

we had lots of rain overnight

it continued to rain most of the day

building the walls


the first wall goes up




more walls up

the view from my kitchen windows

end of framing day 1 after working through the rain


it's a muddy, sloppy mess under the lumber

hopefully it will dry out over the weekend 

the second load of lumber has arrived 



Kim is a hands-on general contractor

second day of framing sees much work done



third lumber drop


floor joists for second floor go up


 Kim installed a silt fence to keep the pad from washing away with all the rain

view of the stairwell from the second floor




second floor walls going up

view from the little house






1 comment: