On March 11th, the first load of lumber was dropped.
hmmmm...where shall we put it?
quite a load
the framers begin - March 12, 2016
we had lots of rain overnight
it continued to rain most of the day
building the walls
the first wall goes up
more walls up
the view from my kitchen windows
end of framing day 1 after working through the rain
it's a muddy, sloppy mess under the lumber
hopefully it will dry out over the weekend
the second load of lumber has arrived
Kim is a hands-on general contractor
second day of framing sees much work done
third lumber drop
floor joists for second floor go up
Kim installed a silt fence to keep the pad from washing away with all the rain
view of the stairwell from the second floor
second floor walls going up
view from the little house
I love it. How exciting!!!